  1. Demolition of existing kitchen & installation of new kitchen
  2. Demolition of existing bathroom, alterations to layout of hydraulic services, waterproofing above and below the screed bed, construction of architectural niches with LED lighting, tiling with mitre joints, installation of new shaving cabinet + mirror and fit-off with new fixtures and fittings.
  3. Installation of new split-system A/C, with concealed bulkhead units
  4. New joinery throughout with Caesarstone benchtops
  5. Demolition of existing floors and polishing the concrete slab with fully-exposed aggregate finish
  6. New doors and hardware
  7. New skirtings throughout
  8. New built-in wardrobes
  9. New window shutters